Published June 1981
| Version v1
Report
Restricted
TOP test with pre-ramp in the CABRI reactor
Description
A transient overpower (TOP) test preceded by a pre-ramp with subsequent cooling time has been carried out in the CABRI driver core. The results have demonstrated the feasibility of this type of test. The pre-ramp rate is actually limited to ≤9 cent/s according to a period limit of ≥ 10 s
Availability note (English)
Available from INIS in electronic form
Files
Additional details
Publishing Information
- Imprint Pagination
- 17 p.
- Report number
- KFK-PSB--01.02.09P70B
INIS
- Country of Publication
- Germany
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 37002704
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- CABRI REACTOR; FEASIBILITY STUDIES; IN PILE LOOPS; REACTOR SAFETY EXPERIMENTS; TRANSIENTS
- Descriptors DEC
- ENRICHED URANIUM REACTORS; POOL TYPE REACTORS; REACTOR COMPONENTS; REACTOR EXPERIMENTAL FACILITIES; REACTORS; RESEARCH AND TEST REACTORS; RESEARCH REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- Refs, figs
- Secondary number(s)
- INIS-DE-PSB--120