Published August 1977
| Version v1
Report
Restricted
In-plant safety/relief valve discharge load test, Monticello Plant. Final report
Description
This document reports the results of the test program of safety/relief valve (SRV) discharge load phenomena through a ramshead discharge device, and the effects upon the Mark I primary containment torus structure of the Monticello Nuclear Power Plant. The objectives were to provide a data base for verifying/improving bubble pressure, water reflood and piping load analytical models, and to measure the structural response of the torus, SRV piping, supports and acceleration of the basement and pedestal
Availability note (English)
MF available from INIS under the Report Number; General Electric Co., San Jose, CA.
Files
Additional details
Publishing Information
- Imprint Pagination
- v p.
- Report number
- NEDC--21581
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 9365854
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- CONTAINMENT SYSTEMS; MONTICELLO REACTOR; TESTING; VALVES
- Descriptors DEC
- BWR TYPE REACTORS; CONTAINMENT; CONTROL EQUIPMENT; ENRICHED URANIUM REACTORS; FLOW REGULATORS; POWER REACTORS; REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS