Developing Major Steps for a Feasibility Study for Upgrading I and C Systems in a Large Scale for an Operating Nuclear Power Plant

  • 1. Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)
  • 2. KHNP Co., Daejeon (Korea, Republic of)
  • 3. SEC Co., Ulsan (Korea, Republic of)

Description

According to the IAEA report as of Jan. 2008, 436 nuclear power reactors are in operation over the world and 368 nuclear power reactors exceed their operating ages by 20 years. The average I and C equipment's life span is 20 years comparing with that the average reactor's life time is 40 to 60 years. This means that a reactor must be faced with I and C equipment obsolescence problems once or twice during its operating years. The I and C equipment is replaced with new equipment only when the obsolescence problem occurs in a nuclear power plant. This is called an equipment basis upgrade in this paper. This replacement is such a general practice that occurs only when needed. We can assume that most of I and C equipment of a plant will meet with the obsolescence problem almost same time since it started operating. Although there must be a little time difference in the occurrence of the problems among I and C equipment, the replacement will be required in consecutive years. With this assumption, it is recommendable to upgrade the equipment, which is to meet with the problem at the same time, with new equipment at the same time. This is called a system basis upgrade in this paper. The system-basis replacement can be achieved in a large scale by coupling systems whose functions are related each other and replacing them together with a new upto- date platform. This paper focuses on the large scale upgrade of I and C systems for existing and operating NPPs. While performing a feasibility study for the large scale upgrade for Korea standard nuclear power plants (KSNPs), six major steps are developed for the study. This paper is to present what to perform in each step

Part of:
Proceedings of the KNS spring meeting

Additional details

Publishing Information

Publisher
KNS
Imprint Place
Daejeon (Korea, Republic of)
Imprint Title
Proceedings of the KNS spring meeting
Imprint Pagination
[1 CD-ROM]
Journal Page Range
[2 p.]

Conference

Title
2009 spring meeting of the KNS
Dates
18-23 May 2009
Place
Jeju (Korea, Republic of)

INIS

Country of Publication
Korea, Republic of
Country of Input or Organization
Korea, Republic of
INIS RN
40099866
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
CONTROL SYSTEMS; FEASIBILITY STUDIES; NUCLEAR POWER PLANTS; REACTOR INSTRUMENTATION
Descriptors DEC
NUCLEAR FACILITIES; POWER PLANTS; THERMAL POWER PLANTS

Optional Information

Notes
7 refs, 2 figs