2005 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action

Description

This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action is functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action, (DOE/ID-10660) and as amended by the agreement to resolve dispute, which was effective in February 2003

Availability note (English)

Available from INIS in electronic form; Also available from OSTI as DE00909860; PURL: https://www.osti.gov/servlets/purl/909860-lowFrc/

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
39 p.
Report number
DOE/ID--11275

Optional Information

Contract/Grant/Project number
AC0705ID14516
Notes
doi 10.2172/909860
Funding organization
US Department of Energy (United States)