Published August 2013 | Version v1
Report

Research program on conditions to failure of high burnup fuel

Description

Regarding the power ramp test to verify the out-of-pile test results on hydrogen-induced cladding failure, situation of the shipping port restoration after the earthquake disaster was investigated for the overseas transportation of test fuel rods which had been interrupted. Its reopening schedule was still currently uncertain and the power ramp test plan also remained suspended. The information about the fuel irradiation performance obtained from JNES projects and international projects, etc. is prepared as database, and based on the recent findings, the fuel irradiation performance models and analysis codes are developed and/or improved. (author)

Part of:
Annual safety research report, JFY 2012

Additional details

Publishing Information

Imprint Title
Annual safety research report, JFY 2012
Imprint Pagination
708 p.
Journal Page Range
p. 43-49
Report number
JNES-RE--2013-0001-Rev.1

Optional Information

Notes
9 refs., 4 figs., 1 tab.; This record replaces 46032160