Reliability and risk treatment centered maintenance
Creators
- 1. Czech University of Life Sciences Prague, Kamycka (Czech Republic)
- 2. Unipetrol A. S, Prague (Czech Republic)
Description
We propose a new methodology for application of well-known tools - RCM, RBI and SIF pro - with the aim to treat risks by means of suitable maintenance. The basis of the new methodology is the complex application of all three methods at the same time and not separately as is typical today. The proposed methodology suggests having just one managing team for reliability and risk treatment centred maintenance (RRTCM), employing existing RCM, RBI, and SIFpro tools concurrently. This approach allows for significant reduction of engineering activities' duration. In the proposed methodology these activities are staged into five phases and structured to eliminate all duplication resulting from separate application of the three tools. The newly proposed methodology saves 45% to 50% of the engineering workload and dequate significant financial savings.
Additional details
Publishing Information
- Journal Title
- Journal of Mechanical Science and Technology (Online)
- Journal Volume
- 28
- Journal Issue
- 10
- Series
- 38 refs, 6 figs, 2 tabs
- Journal Page Range
- p. 3963-3970
- ISSN
- 1976-3824
INIS
- Country of Publication
- Korea, Republic of
- Country of Input or Organization
- Korea, Republic of
- INIS RN
- 47114467
- Subject category
- S42: ENGINEERING;
- Descriptors DEI
- HAZARDS; MAINTENANCE; REDUCTION; RELIABILITY; TOOLS; USES
- Descriptors DEC
- CHEMICAL REACTIONS; EQUIPMENT