Published December 23, 2015 | Version v1
Report

Moly99 Production Facility: Report on Beamline Components, Requirements, Costs

  • 1. Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

Description

In FY14 we completed the design of the beam line for the linear accelerator production design concept. This design included a set of three bending magnets, quadrupole focusing magnets, and octopoles to flatten the beam on target. This design was generic and applicable to multiple different accelerators if necessary. In FY15 we built on that work to create specifications for the individual beam optic elements, including power supply requirements. This report captures the specification of beam line components with initial cost estimates for the NorthStar production facility.This report is organized as follows: The motivation of the beamline design is introduced briefly, along with renderings of the design. After that, a specific list is provided, which accounts for each beamline component, including part numbers and costs, to construct the beamline. After that, this report details the important sections of the beamline and individual components. A final summary and list of follow-on activities completes this report.

Additional details

Publishing Information

Imprint Pagination
13 p.
Report number
LA-UR--15-29675

Optional Information

Contract/Grant/Project number
AC52-06NA25396
Funding organization
USDOE (United States)
Secondary number(s)
OSTIID--1233632