Published May 1, 2009 | Version v1
Report

Vibrational Stability of SRF Accelerator Test Facility at Fermilab

Description

Recently developed, the Superconducting Radio Frequency (SRF) Accelerator Test Facilities at Fermilab support the International Linear Collider (ILC), High Intensity Neutrino Source (HINS), a new high intensity injector (Project X) and other future machines. These facilities; Meson Detector Building (MDB) and New Muon Lab (NML) have very different foundations, structures, relative elevations with respect to grade level and surrounding soil composition. Also, there are differences in the operating equipment and their proximity to the primary machine. All the future machines have stringent operational stability requirements. The present study examines both near-field and ambient vibration in order to develop an understanding of the potential contribution of near-field sources (e.g. compressors, ultra-high and standard vacuum equipment, klystrons, modulators, utility fans and pumps) and distant noise sources to the overall system displacements. Facility vibration measurement results and methods of possible isolation from noise sources are presented and discussed

Availability note (English)

Available from http://lss.fnal.gov/cgi-bin/find_paper.pl?conf-09-083.pdf; PURL: https://www.osti.gov/servlets/purl/952634-3SW8eN/

Additional details

Publishing Information

Imprint Pagination
3 p.
Report number
FERMILAB-CONF--09-083-AD

Conference

Title
Particle Accelerator Conference (PAC 09)
Dates
4-8 May 2009
Place
Vancouver, British Columbia (Canada)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
40080980
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATORS; BLOWERS; COMPRESSORS; FERMILAB; KLYSTRONS; LINEAR COLLIDERS; MESONS; MUONS; NEUTRINOS; SOILS; STABILITY; TEST FACILITIES
Descriptors DEC
ACCELERATORS; BOSONS; ELECTRON TUBES; ELECTRONIC EQUIPMENT; ELEMENTARY PARTICLES; EQUIPMENT; FERMIONS; HADRONS; LEPTONS; LINEAR ACCELERATORS; MASSLESS PARTICLES; MICROWAVE EQUIPMENT; MICROWAVE TUBES; NATIONAL ORGANIZATIONS; US DOE; US ORGANIZATIONS

Optional Information

Contract/Grant/Project number
AC02-76CH03000
Funding organization
US Department of Energy (United States)