Application of unavailability analysis method to determining periodic test procedure of emergency core cooling system
Description
The test interval and the test procedure are the main factors that are related to the reliability of the emergency core cooling system in a nuclear power plant. A method is proposed to specify the allowable ranges of the test intervals for the minimal cut sets in the emergency core cooling system; lower and upper limits of test intervals are selected to minimize unavailability and to assure the unavailability goal respectively. A method is also proposed to determine test procedure. All patterns of test procedure for the emergency core cooling system are generated in the allowable ranges of test intervals, and the test procedure is selected to maximize the index (minus log. of (unavailability over unavailability goal), all devided by man-hours) for the purpose of both reliability increase and man-hours decrease. (author)
Additional details
Publishing Information
- Journal Title
- J. Nucl. Sci. Technol. (Tokyo)
- Journal Volume
- 19
- Journal Issue
- 7
- Series
- J. Nucl. Sci. Technol. (Tokyo).
- Journal Page Range
- 521-527
- ISSN
- 0022-3131
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 14799757
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- ECCS; FAULT TREE ANALYSIS; INSPECTION; NUCLEAR POWER PLANTS; OPTIMIZATION; PERFORMANCE TESTING; RELIABILITY; TIME DEPENDENCE
- Descriptors DEC
- NUCLEAR FACILITIES; POWER PLANTS; REACTOR PROTECTION SYSTEMS; SYSTEM FAILURE ANALYSIS; SYSTEMS ANALYSIS; TESTING; THERMAL POWER PLANTS