Published November 2014 | Version v1
Miscellaneous Open

The releasing process of decontaminated metal materials in UJV Rez, a. s

Creators

  • 1. UJV Rez, a.s., Rez (Czech Republic)

Description

The main activity of Centre of Radioactive Waste Management is to treat the radioactive waste into the defined form for a radioactive waste repository. A part of the processed materials is possible to treat by decontamination and then meet the releasing limits for free release into the environment based on the principle of minimizing the volume of radioactive waste (RAW). Processing of treated RAW is performed by the unique methods and activities included e.g. power hydraulic shears, nibbler, plasma arc cutting, mechanical saw, etc. are used for segmentation. For decontamination are used e. g. High-pressure water jetting, chemical decontamination, ultrasonic bath decontamination, foam decontamination, abrasive blasting etc. The radiation characterization and determination of correlation factors of difficult measure radionuclides are performed before using the decontamination methods. The correlation factor is ratio of activity of difficult measure radionuclides (pure alpha, beta, radionuclides such as 90Sr, 59Ni, 63Ni, 241Am, 239Pu, etc.) and gamma spectrometry measured radionuclides (e. g. 137Cs, 60Co, 152Eu, etc.). The correlation factors are determined for each waste stream with the same history (e. g. tanks, pipelines). These factors are used for calculation the activity of difficult measure radionuclides in the measured material which is not detectable by gamma spectrometry. The prepared material for free release into the environment is measured on the surface contamination and the specific (mass) activity. Both radiological measurements (surface contamination and specific activity) must be done under the Atomic Act and Decree No. 307/2002 Coll. Special measuring device (gamma spectrometer) for material measurement for free releasing material into the environment was developed by company ENVINET a.s. The device is operated by contractor of partner company. The expected amount of released material is about 150 tons, which is about 25 % of total amount of decommissioned technology in UJV Rez, a. s. The total measured amount material is 47.3 tons of metal material until this time. The total amount prepared for free release into the environment is 45.5 tons. (authors)

Files

46091492.pdf

Files (45.5 kB)

Name Size Download all
md5:f3c8e4d87e86b7896203ddf7a95a7574
45.5 kB Preview Download
Part of:
XXXVI. Days of Radiation Protection. Book of Abstracts

Additional details

Publishing Information

Publisher
Environment, a.s.
Imprint Place
Nitra (Slovakia)
ISBN
978-80-89384-08-4
Imprint Title
XXXVI. Days of Radiation Protection. Book of Abstracts
Imprint Pagination
144 p.
Journal Page Range
p. 95
Report number
INIS-SK--2015-002

Conference

Title
36. Days of Radiation Protection Conference
Dates
10-14 Nov 2014
Place
Poprad (Slovakia)

Optional Information

Notes
Lector: Nikodemova, Denisa