Published October 1993 | Version v1
Report Open

From preliminary remediation goals to final remediation levels: Waltzing down a tortuous path

Description

The development of cleanup criteria is one of the major objectives of the risk assessment process at a Superfund site. The process begins at scoping, with the development of preliminary remediation goals (PRGs); continues into the baseline risk assessment and feasibility study, during which the significant contaminants of concern and pathways are identified and modifying factors applied to the PRGs; and is completed with the determination of the final remediation levels, set out in the record of decision. This process is described for the chemical plant operable unit of the Weldon Spring site, for which soil cleanup criteria were finalized in the record of decision, signed in September of 1993

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE94002906; NTIS; US Govt. Printing Office Dep.

Files

25025097.pdf

Files (395.5 kB)

Name Size Download all
md5:7cbddb3856b175ce502901291e709308
395.5 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
8 p.
Report number
ANL/EA/CP--79849

Conference

Title
Department of Energy environmental remediation conference.
Dates
24-28 Oct 1993.
Place
Augusta, GA (United States).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
25025097
Subject category
S58: GEOSCIENCES;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ALARA; CHEMICAL WASTES; DECONTAMINATION; FEASIBILITY STUDIES; PROGRAM MANAGEMENT; RADIOACTIVE WASTES; REMEDIAL ACTION; RISK ASSESSMENT; SITE CHARACTERIZATION; SOILS
Descriptors DEC
CLEANING; MANAGEMENT; MATERIALS; NONRADIOACTIVE WASTES; RADIOACTIVE MATERIALS; WASTES

Optional Information

Contract/Grant/Project number
Contract W-31109-ENG-38
Funding organization
USDOE, Washington, DC (United States).
Secondary number(s)
CONF-931095--55.