How to implement all HL-LHC upgrades
Creators
- 1. European Organization for Nuclear Research, Geneva (Switzerland)
Description
The luminosity upgrade will require major changes in the LHC machine layout : about 1.2 km of the machine will undergo major renova tion or modification. In the paper we will review the list of main equipment foreseen to be replaced or to be added. We will review the upgrade plan that should start already in the Long Shutdown (LS) 2 (with the installation of the first dispersion suppressor 11T dipole – collimator unit , the superconducting link in Point 7 and the cryo-plant in Point 4), through to the major works in LS3, synchronized with an upgrade of the LHC detectors. Best estimates of the required duration of the various shutdowns will be discussed, and also the main risks and their mitigation
Availability note (English)
Available on-line: http://cds.cern.ch/record/1977363/files/105-117-Rossi.pdfAdditional details
Identifiers
Publishing Information
- ISBN
- 978-92-9083-407-6
- Imprint Title
- Proceedings of RLIUP: Review of LHC and Injector Upgrade Plans
- Imprint Pagination
- 209 p.
- Series
- CERN Yellow Reports Series
- Journal Page Range
- p. 105-117
- ISSN
- 0007-8328
- Report number
- CERN--2014/006
Conference
- Title
- Review of LHC and Injector Upgrade Plans
- Acronym
- RLIUP
- Dates
- 29-31 Oct 2013
- Place
- Archamps (France)
INIS
- Country of Publication
- European Organization for Nuclear Research (CERN)
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 47119767
- Subject category
- S72: PHYSICS OF ELEMENTARY PARTICLES AND FIELDS;
- Resource subtype / Literary indicator
- Conference, Non-conventional Literature
- Descriptors DEI
- BEAM LUMINOSITY; CERN LHC; COLLIMATORS; SHUTDOWN
- Descriptors DEC
- ACCELERATORS; CYCLIC ACCELERATORS; STORAGE RINGS; SYNCHROTRONS
Optional Information
- Copyright
- Copyright (c) 2014 CERN