Published 2014 | Version v1
Miscellaneous

How to implement all HL-LHC upgrades

Description

The luminosity upgrade will require major changes in the LHC machine layout : about 1.2 km of the machine will undergo major renova tion or modification. In the paper we will review the list of main equipment foreseen to be replaced or to be added. We will review the upgrade plan that should start already in the Long Shutdown (LS) 2 (with the installation of the first dispersion suppressor 11T dipole – collimator unit , the superconducting link in Point 7 and the cryo-plant in Point 4), through to the major works in LS3, synchronized with an upgrade of the LHC detectors. Best estimates of the required duration of the various shutdowns will be discussed, and also the main risks and their mitigation

Availability note (English)

Available on-line: http://cds.cern.ch/record/1977363/files/105-117-Rossi.pdf
Part of:
Proceedings of RLIUP: Review of LHC and Injector Upgrade Plans

Additional details

Publishing Information

ISBN
978-92-9083-407-6
Imprint Title
Proceedings of RLIUP: Review of LHC and Injector Upgrade Plans
Imprint Pagination
209 p.
Series
CERN Yellow Reports Series
Journal Page Range
p. 105-117
ISSN
0007-8328
Report number
CERN--2014/006

Conference

Title
Review of LHC and Injector Upgrade Plans
Acronym
RLIUP
Dates
29-31 Oct 2013
Place
Archamps (France)

INIS

Country of Publication
European Organization for Nuclear Research (CERN)
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
47119767
Subject category
S72: PHYSICS OF ELEMENTARY PARTICLES AND FIELDS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
BEAM LUMINOSITY; CERN LHC; COLLIMATORS; SHUTDOWN
Descriptors DEC
ACCELERATORS; CYCLIC ACCELERATORS; STORAGE RINGS; SYNCHROTRONS

Optional Information

Copyright
Copyright (c) 2014 CERN