Published 2000 | Version v1
Book

Use of PSA in pursuit of safety improvement at the Paks; NPP. Latest results and insights

  • 1. Villamosenergiaipari Kutato Intezet, Budapest (Hungary)

Description

Unit specific level 1 PSA models have been developed for internal initiators at full power operation of the four VVER 440-213 type reactors of the Paks NPP. Low power and shutdown operating modes of a planned refueling outage have also been included in the plant PSA, and the core damage risk due to internal fires and flooding has been quantified too. Currently seismic PSA is in progress. In addition PSA has been a useful tool to evaluate the effectiveness of the measures taken and quantify the level of safety achieved. This is accomplished by the implementation of a living PSA program. Due to the numerous plant modifications PSA models and results are updated annually. The paper summarizes the latest PSA results for the Paks NPP. Examples are given on plant improvements supported by PSA, and the effect of those improvements on the core damage risk is demonstrated. Changes in core damage risk and the main risk contributors are shown for the past few years. The main features of the living PSA program are discussed, and future plans on PSA and PSA applications for the Paks NPP are described. (author)

Part of:
PSAM 5: Probabilistic safety assessment and management

Additional details

Publishing Information

Publisher
Universal Academy
Imprint Place
Tokyo (Japan)
ISBN
4-946443-64-9
Imprint Title
PSAM 5: Probabilistic safety assessment and management
Imprint Pagination
2820 p.
Journal Page Range
p. 329-334

Conference

Title
5. international conference on probabilistic safety assessment and management
Acronym
PSAM 5
Dates
27 Nov - 1 Dec 2000
Place
Osaka (Japan)

Optional Information

Notes
Vol. 1/4 Imprint:Published in 4 volumes, also available on CD-ROM can be used for Windows 95/98/2000, Macintosh and UNIX. Also published in Frontiers Science Series No.34, ISSN 0915-8502