Published 1978 | Version v1
Report

Accelerator operations and development

Description

Operation of the 88-inch cyclotron for the period July 1977, through June 1978, is reviewed, and developments in the following areas are briefly summarized: grid matching transformer; frequency lowering; maximum coil current; μs beam pulsing system; cryopumping system; PIG source; and beam monitoring. Improvements to the polarized ion source are detailed. Use of the cyclotron for radioisotope dating is described. 5 figures, 2 tables

Additional details

Additional titles

Augmented title (English)
LBL

Publishing Information

Imprint Title
Nuclear science annual report, July 1, 1977-June 30, 1978
Journal Page Range
p. 235-241.
Report number
LBL--8151

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
11517922
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Numerical Data
Descriptors DEI
AGE ESTIMATION; CYCLOTRONS; EXPERIMENTAL DATA; GRAPHS; ION SOURCES; LAWRENCE BERKELEY LABORATORY; OPERATION; POLARIZED BEAMS; RADIOISOTOPES
Descriptors DEC
ACCELERATORS; BEAMS; CYCLIC ACCELERATORS; DATA; DATA FORMS; INFORMATION; ISOTOPES; NATIONAL ORGANIZATIONS; NUMERICAL DATA; US AEC; US ERDA; US ORGANIZATIONS