Starting of nuclear power stations

Creators

Description

The procedure is briefly characterized of jobs in nuclear power plant start-up and the differences are pointed out from those used in conventional power generation. Pressure tests are described oriented to tightness, tests of the secondary circuit and of the individual nodes and facilities. The possibility is shown of increased efficiency of such jobs on an example of the hydraulic tests of the second unit of the Dukovany nuclear power plant where the second and the third stages were combined in the so-colled integrated hydraulic test. (Z.M.). 5 figs

Additional details

Publishing Information

Journal Title
Skoda Review
Journal Issue
no.4
Series
Skoda Rev.
ISSN
0374-4523
CODEN
SKORA

INIS

Country of Publication
Czech Republic
Country of Input or Organization
Serbia and Montenegro
INIS RN
20064193
Subject category
S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
Descriptors DEI
REACTOR START-UP; WWER TYPE REACTORS
Descriptors DEC
ENRICHED URANIUM REACTORS; POWER REACTORS; PWR TYPE REACTORS; REACTORS; START-UP; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS