Published March 25, 1999 | Version v1
Report

Design and development of the vacuum systems for the APT project ED and D cryomodule

Description

The mechanical design for both the insulating vacuum system and the cavity vacuum system of the APT ED and D Cryomodule is summarized. The pre-cooldown pressure limits for the insulating vacuum and the cavity vacuum are 10-5 Torr and 10-6 Torr, respectively. In addition, the cold cavity operating pressure limits are 10-6 Torr for the insulating system and 10-8 Torr for the cavity system. The designs of these systems utilize both turbomolecular pumps and the cold surfaces of the superconducting Nb cavities to arrive at and maintain their operating vacuum pressures. A synopsis of the analysis undertaken to predict the vacuum system performance is also presented

Availability note (English)

Available from PURL: https://www.osti.gov/servlets/purl/9620-MuQqzo/native/

Additional details

Publishing Information

Imprint Pagination
1.2 Megabytes
Report number
UCRL-JC--133054

Conference

Title
Particle Accelerator Conference
Acronym
PAC 99
Dates
29 Mar - 2 Apr 1999
Place
New York, NY (United States)

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
32034191
Subject category
S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ACCELERATORS; CAVITIES; DESIGN; HYDROGEN PRODUCTION; PERFORMANCE; SUPERCONDUCTING DEVICES; TRITIUM; TURBOMOLECULAR PUMPS; VACUUM SYSTEMS
Descriptors DEC
BETA DECAY RADIOISOTOPES; BETA-MINUS DECAY RADIOISOTOPES; EQUIPMENT; HYDROGEN ISOTOPES; ISOTOPES; LABORATORY EQUIPMENT; LIGHT NUCLEI; NUCLEI; ODD-EVEN NUCLEI; PUMPS; RADIOISOTOPES; VACUUM PUMPS; YEARS LIVING RADIOISOTOPES

Optional Information

Contract/Grant/Project number
W-7405-ENG-48
Funding organization
USDOE Office of Defense Programs (DP) (United States)
Secondary number(s)
DP--0404012