Environmental Implementation Plan
Description
Environmental protection is an integral part of SRS's emergency-response planning because spills or releases of hazardous substances can spread offsite, causing exposure to people and degradation of the environment. The ability to respond to an unplanned release of a hazardous substance requires that the site have the capability to: rapidly determine and report the occurrence; rapidly assess the potential effects; immediately notify responsible authorities; institute monitoring and mitigation activities. To accomplish these objectives, SRS (Savannah River Site) maintains real-time data-acquisition models to accurately predict plume movement with time, and well-thought out and rehearsed response plans. This section covers the emergency-response activities that involve detection, notification, characterization, and definition of the extent and affect of a release
Availability note (English)
MF available from INIS under the Report Number; Also available from OSTI as DE94017784; NTIS; US Govt. Printing Office Dep.Files
26010529.pdf
Files
(1.1 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:64b514424ecc96b391f15e35f1759f53
|
1.1 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 17 p.
- Report number
- WSRC-IM--93-17-12
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 26010529
- Subject category
- S61: RADIATION PROTECTION AND DOSIMETRY; S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- ACCIDENTS; DATA ACQUISITION; DETECTION; EMERGENCY PLANS; ENVIRONMENTAL QUALITY; MONITORING; POLLUTION; REAL TIME SYSTEMS; SAVANNAH RIVER PLANT
- Descriptors DEC
- NATIONAL ORGANIZATIONS; US AEC; US DOE; US ERDA; US ORGANIZATIONS
Optional Information
- Contract/Grant/Project number
- Contract AC09-89SR18035
- Funding organization
- USDOE, Washington, DC (United States).