Published 1983 | Version v1
Book

Operational factors in the design of the pbfa ii accelerator

  • 1. Pulsed Power Operations Div. 1254, Sandia National Lab., Albuquerque, NM

Description

The design of the multi-module, multi-terawatt, multi-megajoule PBFA II accelerator mandates special consideration of factors aiding in the effective assembly, optimization, and long term operation of the facility. In this paper, the operational efficiency of PBFA II is anticipated to be improved by addressing: the necessary steps in the evolution of a super power generator, a phased implementation philosophy for engineering the facility, the advantages of 3-dimensional design modeling, and advantages of automation technology in control/monitor, data acquisition, and component inventory areas

Additional details

Publishing Information

Publisher
Institution of Electrical and Electronics Engineers.
Imprint Place
New York, NY (USA)
Imprint Title
Fourth IEEE pulsed power conference
Journal Page Range
p. 58-60.

Conference

Title
IEEE power electronics specialists conference.
Dates
6-9 Jun 1983.
Place
Albuquerque, NM (USA).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
17048674
Subject category
S70: PLASMA PHYSICS AND FUSION TECHNOLOGY; S43: PARTICLE ACCELERATORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
COMPUTER-AIDED DESIGN; COMPUTERIZED SIMULATION; DATA ACQUISITION SYSTEMS; EFFICIENCY; ENGINEERING; MONITORING; ON-LINE CONTROL SYSTEMS; OPERATION; OPTIMIZATION; PARTICLE BEAM FUSION ACCELERAT
Descriptors DEC
ACCELERATORS; CONTROL SYSTEMS; ON-LINE SYSTEMS; SIMULATION