Published July 1984 | Version v1
Journal article

Results of sixth regular inspection of No.1 plant in Hamaoka Nuclear Power Station

Creators

Description

The sixth regular inspection of No.1 plant in the Hamaoka Nuclear Power Station, Chube Electric Power Co., Inc., was carried out from June 4 to October 18, 1983. The objects of inspection were the reactor proper, reactor cooling system, measurement and control system, fuel facilities, radiation control facilities, waste facilities, reactor containment installation and emergency standby generator system. The inspection of appearance, disassembled parts, leak, function, performance and so on was performed on these objects, but abnormality was not found at all. The works related to this regular inspection were finished within the range of the allowable dose based on the law. The main reconstruction works carried out during the regular inspection were the replacement of jet pump beams, the additional installation of drain sump pumps and the repair of feed heaters and piping. (Kako, I.)

Additional details

Publishing Information

Journal Title
Genshiryoku Anzen Iinkai Geppo
Journal Issue
no.65
Series
Genshiryoku Anzen Iinkai Geppo.