Results of sixth regular inspection of No.1 plant in Hamaoka Nuclear Power Station
Creators
Description
The sixth regular inspection of No.1 plant in the Hamaoka Nuclear Power Station, Chube Electric Power Co., Inc., was carried out from June 4 to October 18, 1983. The objects of inspection were the reactor proper, reactor cooling system, measurement and control system, fuel facilities, radiation control facilities, waste facilities, reactor containment installation and emergency standby generator system. The inspection of appearance, disassembled parts, leak, function, performance and so on was performed on these objects, but abnormality was not found at all. The works related to this regular inspection were finished within the range of the allowable dose based on the law. The main reconstruction works carried out during the regular inspection were the replacement of jet pump beams, the additional installation of drain sump pumps and the repair of feed heaters and piping. (Kako, I.)
Additional details
Publishing Information
- Journal Title
- Genshiryoku Anzen Iinkai Geppo
- Journal Issue
- no.65
- Series
- Genshiryoku Anzen Iinkai Geppo.
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 16061414
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Numerical Data
- Descriptors DEI
- FEEDWATER HEATERS; HAMAOKA-1 REACTOR; INSPECTION; PERSONNEL; PUMPS; RADIATION DOSES; REACTOR MAINTENANCE; REPAIR; STATISTICAL DATA; TUBES
- Descriptors DEC
- BWR TYPE REACTORS; DATA; ENRICHED URANIUM REACTORS; EQUIPMENT; HEATERS; INFORMATION; MAINTENANCE; NUMERICAL DATA; POWER REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS