Regulatory aspects of fusion power-lessons from fission plants

Description

Experience from fission reactors has shown the regulatory process for licensing a nuclear facility to be legalistic, lengthy, unpredictable, and costly. This experience also indicates that much of the regulatory debate is focused on safety margins, that is, the smaller the safety margins the bigger the regulatory debate and the greater the amount of proof required to satisfy the regulatory. Such experience suggests that caution and prudence guide the development of a regulatory regime for fusion reactors. Fusion has intrinsic safety and environmental advantages over fission, which should alleviate significantly, or even eliminate, the regulatory problems associated with fission. The absence of a criticality concern and the absence of fission products preclude a Chernobyl type accident from occurring in a fusion reactor. Although in a fusion reactor there are large inventories of radioactive products that can be mobilized, the total quantity is orders of magnitude smaller than in fission power reactors. The bulk of the radioactivity in a fusion reactor is either activation products in steel structures, or tritium fuel supplies safely stored in the form of a metal tritide in storage beds. The quantity of tritium that can be mobilized under accident conditions is much less than ten million curies. This compares very favorably with a fission product inventory greater than ten billion curies in a fission power reactor. Furthermore, in a fission reactor, all of the reactivity is contained in a steel vessel that is pressurized to about 150 atmospheres, whereas in a fusion reactor, the inventory of radioactive material is dispersed in different areas of the plant, such that it is improbable that a single event could give rise to the release of the entire inventory to the environment. With such significant intrinsic safety advantages there is no a priori need to make fusion requirements/regulations more demanding and more stringent than fission

Additional details

Publishing Information

Journal Title
Journal of Fusion Energy
Journal Volume
12
Journal Issue
1-2
Journal Page Range
p. 195-199.
ISSN
0164-0313
CODEN
JFENDS

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
25042516
Subject category
S70: PLASMA PHYSICS AND FUSION TECHNOLOGY;
Descriptors DEI
LICENSING PROCEDURES; LICENSING REGULATIONS; THERMONUCLEAR REACTORS
Descriptors DEC
ADMINISTRATIVE PROCEDURES; LAWS; REGULATIONS