Published April 2008 | Version v1
Journal article

Mechanism of fuel assembly bowing in PWR and preventive measures

  • 1. Daya Bay Nuclear Power Operations and Management Co., Ltd., Shenzhen, Guangdong (China)
  • 2. National Key Laboratory of Reactor System Design Technology, Nuclear Power Institute of China, Chengdu (China)

Description

Excessive fuel assembly bowing may induce reloading or unloading difficulties, incomplete control rod insertion, fuel assembly defect, and quadrant power tilts. To avoid fuel assembly excessive bowing is import for PWR safety operation. This paper analyzes the phenomenon of fuel assembly bowing and its impact, the factors that affect assembly bowing, mechanism and preventive measures of assembly bowing. (authors)

Additional details

Publishing Information

Journal Title
Nuclear Power Engineering
Journal Volume
29
Journal Issue
2
Journal Page Range
p. 55-57, 73
ISSN
0258-0926

Optional Information

Notes
3 figs., 6 refs.