Resolution of digital instrumentation and control and human factors technical and regulatory issues for new plants and for modernization of operating plants
Creators
- 1. Electric Power Research Institute, 3420 Hillview Avenue, Palo Alto CA 94304 (United States)
- 2. Electric Power Research Institute EPRI, 3420 Hillview Avenue, Palo Alto CA 94304 (United States)
- 3. Electric Power Research Institute EPRI, 1300 W. Wt Harris Boulevard, Charlotte NC 28262 (United States)
Description
There are several technical and regulatory issues in the areas of digital I and C, human factors, and control rooms needing generic resolution. If they are not generically resolved, they can contribute to protracted regulatory reviews for operating plant license amendments and substantial delays and increased costs for new plant COL approvals. Therefore; a coordinated, proactive program has been established to resolve key issues. Both Industry and NRC have roles in resolving these key issues and addressing them in future design efforts and regulatory reviews. The Industry initiative is led by the NEI Digital I and C and Human Factors Working Group. NRC has established Task Working Groups under the NRC Digital I and C Steering Committee to address the issues and interact with Industry. EPRI is providing technical input and resolution leadership for some of the issues being addressed in three of the task working groups. For the Highly Integrated Control Room - Human Factors Task area, EPRI has taken the lead in developing draft industry position technical reports for the following three issues: 1) Minimum inventory of human system interfaces, 2) Computerized procedures and associated topics of automation and soft controls, and 3) Methodology to determine the acceptability of manual operator actions response times for a BTP 7-19 software common cause failure. For the Diversity and Defense-in-Depth area, EPRI has taken the lead in developing two draft industry position technical papers on the following topics: 1) Integrating defensive measures and diversity attributes to protect against digital common cause failures and 2) Susceptibility of digital devices and components to common cause failures. For the Risk Informing area, EPRI has taken the lead in developing two draft industry position technical papers on the following topics: 1) Clarifying how to use current methods to model digital systems in a PRA and 2) Application of PRA to specific digital I and C issues. (authors)
Additional details
Publishing Information
- Publisher
- American Nuclear Society - ANS
- Imprint Place
- La Grange Park (United States)
- ISBN
- 0-89448-061-8
- Imprint Title
- Proceedings of the 2008 International Congress on Advances in Nuclear Power Plants - ICAPP '08
- Imprint Pagination
- 2696 p.
- Journal Page Range
- p. 1338-1346
Conference
- Title
- 2008 International Congress on Advances in Nuclear Power Plants
- Acronym
- ICAPP '08
- Dates
- 8-12 Jun 2008
- Place
- Anaheim, CA (United States)
INIS
- Country of Publication
- United States
- Country of Input or Organization
- France
- INIS RN
- 42094921
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- COMPUTER CODES; CONTROL ROOMS; DESIGN; DIGITAL SYSTEMS; FAILURES; HUMAN FACTORS; LICENSES; LICENSING REGULATIONS; MAN-MACHINE SYSTEMS; REACTOR CONTROL SYSTEMS; REACTOR INSTRUMENTATION
- Descriptors DEC
- CONTROL SYSTEMS; LAWS; REGULATIONS
Optional Information
- Notes
- 10 refs.