Published 2008 | Version v1
Book

Resolution of digital instrumentation and control and human factors technical and regulatory issues for new plants and for modernization of operating plants

  • 1. Electric Power Research Institute, 3420 Hillview Avenue, Palo Alto CA 94304 (United States)
  • 2. Electric Power Research Institute EPRI, 3420 Hillview Avenue, Palo Alto CA 94304 (United States)
  • 3. Electric Power Research Institute EPRI, 1300 W. Wt Harris Boulevard, Charlotte NC 28262 (United States)

Description

There are several technical and regulatory issues in the areas of digital I and C, human factors, and control rooms needing generic resolution. If they are not generically resolved, they can contribute to protracted regulatory reviews for operating plant license amendments and substantial delays and increased costs for new plant COL approvals. Therefore; a coordinated, proactive program has been established to resolve key issues. Both Industry and NRC have roles in resolving these key issues and addressing them in future design efforts and regulatory reviews. The Industry initiative is led by the NEI Digital I and C and Human Factors Working Group. NRC has established Task Working Groups under the NRC Digital I and C Steering Committee to address the issues and interact with Industry. EPRI is providing technical input and resolution leadership for some of the issues being addressed in three of the task working groups. For the Highly Integrated Control Room - Human Factors Task area, EPRI has taken the lead in developing draft industry position technical reports for the following three issues: 1) Minimum inventory of human system interfaces, 2) Computerized procedures and associated topics of automation and soft controls, and 3) Methodology to determine the acceptability of manual operator actions response times for a BTP 7-19 software common cause failure. For the Diversity and Defense-in-Depth area, EPRI has taken the lead in developing two draft industry position technical papers on the following topics: 1) Integrating defensive measures and diversity attributes to protect against digital common cause failures and 2) Susceptibility of digital devices and components to common cause failures. For the Risk Informing area, EPRI has taken the lead in developing two draft industry position technical papers on the following topics: 1) Clarifying how to use current methods to model digital systems in a PRA and 2) Application of PRA to specific digital I and C issues. (authors)

Part of:
Proceedings of the 2008 International Congress on Advances in Nuclear Power Plants - ICAPP '08

Additional details

Publishing Information

Publisher
American Nuclear Society - ANS
Imprint Place
La Grange Park (United States)
ISBN
0-89448-061-8
Imprint Title
Proceedings of the 2008 International Congress on Advances in Nuclear Power Plants - ICAPP '08
Imprint Pagination
2696 p.
Journal Page Range
p. 1338-1346

Conference

Title
2008 International Congress on Advances in Nuclear Power Plants
Acronym
ICAPP '08
Dates
8-12 Jun 2008
Place
Anaheim, CA (United States)

INIS

Country of Publication
United States
Country of Input or Organization
France
INIS RN
42094921
Subject category
S22: GENERAL STUDIES OF NUCLEAR REACTORS;
Resource subtype / Literary indicator
Conference
Descriptors DEI
COMPUTER CODES; CONTROL ROOMS; DESIGN; DIGITAL SYSTEMS; FAILURES; HUMAN FACTORS; LICENSES; LICENSING REGULATIONS; MAN-MACHINE SYSTEMS; REACTOR CONTROL SYSTEMS; REACTOR INSTRUMENTATION
Descriptors DEC
CONTROL SYSTEMS; LAWS; REGULATIONS

Optional Information

Notes
10 refs.