Published 1995
| Version v1
Report
Restricted
Long-term decontamination engineering study. Volume 3: Appendix E, Appendix F, Appendix G, Appendix H
Description
Appendix E contains a T plant condition and viability assessment. Appendix F describes the upgrades recommended by the viability assessment provided in Appendix D. Appendix G contains cost estimating information for the two T plant scenarios. Scenario 1 is the previously estimated and evaluated Long Term/Long Length option and Scenario 2 is the Full Service option, also previously estimated and evaluated. Appendix H contains costs estimating information for the two New Facility scenarios. Scenario 1 is the annex facility proposed to be placed near the existing 2706-T Facility. Scenario 2 is the large, full service, new facility previously estimated and evaluated
Availability note (English)
MF available from INIS under the Report Number; Also available from OSTI as DE95010932; NTIS; US Govt. Printing Office Dep.
Files
Additional details
Publishing Information
- Imprint Pagination
- 609 p.
- Report number
- WHC-SD--WM-ES-283-Vol.3
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 26067008
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS; S11: NUCLEAR FUEL CYCLE AND FUEL MATERIALS; S12: MANAGEMENT OF RADIOACTIVE WASTES, AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES;
- Resource subtype / Literary indicator
- Numerical Data
- Descriptors DEI
- COMPILED DATA; DECONTAMINATION; ENGINEERING; FUEL REPROCESSING PLANTS; HANFORD RESERVATION; RADIOACTIVE WASTE FACILITIES
- Descriptors DEC
- CLEANING; DATA; INFORMATION; NATIONAL ORGANIZATIONS; NUCLEAR FACILITIES; NUMERICAL DATA; US DOE; US ORGANIZATIONS
Optional Information
- Contract/Grant/Project number
- Contract AC06-87RL10930
- Funding organization
- USDOE, Washington, DC (United States).