Published 1995 | Version v1
Book

The Norne field development overview

Creators

Description

The Norne field is the largest discovery on the Norwegian continental shelf in more than a decade with recoverable oil reserves of 450 Million bbl. Reservoir drive mechanism will be a combination of gas and water reinjection. The largest monohull production ship in the world will be built to develop the field. To improve the project economics and company performance a clear objective was established to reduce investments costs by 25--30% and a time from find to first oil of 5--6 years. The paper will describe both the concept development chosen to achieve these goals and the method of working used to find a simple robust solution to meet uncertainties in project development, reservoir performance and regional potential while maintaining a fast track approach

Additional details

Publishing Information

Publisher
Offshore Technology Conference.
Imprint Place
Richardson, TX (United States)
Imprint Title
27. Annual Offshore Technology Conference: 1995 Proceedings. Volume 4: Field drilling and development systems
Imprint Pagination
688 p.
Journal Page Range
p. 533-541.

Conference

Title
27. offshore technology conference.
Dates
1-4 May 1995.
Place
Houston, TX (United States).

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
27037641
Subject category
S02: PETROLEUM;
Resource subtype / Literary indicator
Conference
Descriptors DEI
ECONOMIC ANALYSIS; NORTH SEA; NORWAY; OIL FIELDS; PLANNING; RESERVOIR ENGINEERING; RESOURCE DEVELOPMENT
Descriptors DEC
ATLANTIC OCEAN; DEVELOPED COUNTRIES; ENGINEERING; EUROPE; GEOLOGIC DEPOSITS; MINERAL RESOURCES; PETROLEUM DEPOSITS; RESOURCES; SCANDINAVIA; SEAS; SURFACE WATERS; WESTERN EUROPE

Optional Information

Secondary number(s)
CONF-950501--.