Japan: Decommissioning of JMTR and Study for Construction of a New Material Testing Reactor

  • 1. Oarai Research and Development Institute, Sector of Fast Reactor and Advanced Reactor Research and Development, Japan Atomic Energy Agency (JAEA) 4002 Narita-cho, Oarai, Ibaraki 311-1393 (Japan)

Description

The JMTR operation was once stopped in order to be checked & reviewed in August 2006, and the refurbishment and restart of the JMTR was finally determined by the national discussion. The refurbishment was started in FY2007 and was finished in March 2011. However, on March 11, 2011, the Great-Eastern-Japan- Earthquake occurred, and functional tests before the JMTR restart were delayed. On the other hand, based on the safety assessments considering the 2011 earthquake new regulatory requirements were established on December 18, 2013 by the NRA. The new regulatory requirements include the satisfaction of integrities for the updated earthquake forces, tsunami, the consideration of natural phenomena, and the management of consideration in the Beyond Design Basis Accidents (BDBA) to protect fuel damage and to mitigate impact of the accidents. Analyses related to the new regulatory requirements have intensively been performed timely, and an application to the NRA had been submitted in March 27, 2015. After submission of the application, a seismic resistance assessment of the JMTR reactor building was carried out by assuming the standard earthquake ground motion of 810 gal. As a result, it was found that seismic reinforcement work for reactor building and reactor pool wall were required. As a result, it became clear that at least 7 years of reinforcement work and a cost of about 40 billion yen are required for seismic reinforcement and to meet new regulatory standards. At the same time, it was made clear that high availability such as 8 operation cycles per year as originally planned cannot be expected due to aging problem. For this reason, JAEA positioned the JMTR as a decommissioning facility in the mid- and long-term plan of JAEA announced in April 2017. JAEA started to study the construction of a new material testing reactor. The examination results will be compiled by the end of FY2019. (author)

Part of:
Sustainability and Self-reliance of National Nuclear Institutions. Proceedings of a Workshop

Additional details

Publishing Information

ISBN
978-92-0-134621-6
Imprint Title
Sustainability and Self-reliance of National Nuclear Institutions. Proceedings of a Workshop
Imprint Pagination
128 p.
Journal Page Range
p. 45-56
ISSN
1011-4289
Report number
IAEA-TECDOC--1943

Conference

Title
Regional Workshop on Sustainability of National Nuclear Institutions
Dates
9-12 Apr 2019
Place
Daejeon (Korea, Republic of)

Optional Information

Notes
3 refs., 13 figs., 1 tab.