Device for forecasting reactor power-up routes
Description
Purpose: To improve the reliability and forecasting accuracy for a device forecasting the change of the state on line in BWR type reactors. Constitution: The present state in a nuclear reactor is estimated in a present state judging section based on measuring signals for thermal power, core flow rate, control rod density and the like from the nuclear reactor, and the estimated results are accumulated in an operation result collecting section. While on the other hand, a forecasting section forecasts the future state in the reactor based on the signals from the forecasting condition setting section. The actual result values from the collecting section and the forecasting results are compared to each other. If they are not equal, new setting signals are outputted from the setting section to perform the forecasting again. These procedures are repeated till the difference between the forecast results and the actual result values is minimized, by which accurate forecasting for the state of the reactor is made possible. (Furukawa, Y.)
Availability note (English)
Available from JAPATIC. Also available from INPADOC.Additional details
Publishing Information
- Imprint Pagination
- 3 p.
- IPC:
- Int. Cl. G21C7/00; G21D3/00.
- IPC
- Int. Cl. G21C7/00; G21D3/00.
- Patent number
- JP patent document 55-83883/A/
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 12629795
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Resource subtype / Literary indicator
- Non-conventional Literature
- Descriptors DEI
- BWR TYPE REACTORS; CONTROL ROD WORTHS; DATA PROCESSING; FLOW RATE; FORECASTING; ON-LINE CONTROL SYSTEMS; POWER DISTRIBUTION; REACTOR OPERATION
- Descriptors DEC
- CONTROL SYSTEMS; ON-LINE SYSTEMS; OPERATION; REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS