Published 1993
| Version v1
Book
The trials and tribulations of designing a DSM data base at Boston Edison
Creators
Description
This paper highlights the iterative steps necessary in developing a real-world mission-critical application at Boston Edison. The DSM System is the result of over two years of effort to develop a workable Demand Side Management (DSM) tracking system. Today, the system continues to evolve and change but Boston Edison no longer is open-quotes fitting square pegs into round holes.close quotes
Additional details
Publishing Information
- Publisher
- The Fairmont Press, Inc.
- Imprint Place
- Lilburn, GA (United States)
- Imprint Title
- Innovative energy and environmental applications
- Imprint Pagination
- 637 p.
- Journal Page Range
- p. 185-189.
Conference
- Title
- 15. world energy engineering congress (WEEC).
- Dates
- 13-15 Oct 1992.
- Place
- Atlanta, GA (United States).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 24054952
- Subject category
- S29: ENERGY PLANNING, POLICY AND ECONOMY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- DEMAND FACTORS; ELECTRIC POWER; ENERGY CONSERVATION; ENERGY POLICY; IMPLEMENTATION
- Descriptors DEC
- POWER