Published May 1995
| Version v1
Report
Open
Investigation of high purity beryllium for the International Thermonuclear Experimental Reactor (ITER), Task 002. Final report
Description
The report includes a description of experimental abilities of Solid Structure Research Laboratory of IAE NNC RK, a results of microstructural characterization of A-4 grade polycrystal Beryllium produced at the Ulba metal plant and a technical project-for irradiation experiments. Technical project contains a detailed description of five proposed experiments, clearing behavior of Beryllium materials under the influence of irradiation, temperature, helium and hydrogen accumulation. Complex irradiation jobs, microstructural investigations and mechanical tests are planned in the framework of these experiments
Availability note (English)
MF available from INIS under the Report Number; Also available from OSTI as DE97002587; NTIS; US Govt. Printing Office Dep.Files
28044490.pdf
Files
(1.3 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:27b337ac13808af6b268a79b0b4293f3
|
1.3 MB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 70 p.
- Report number
- LA-SUB--96-106
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 28044490
- Subject category
- S70: PLASMA PHYSICS AND FUSION TECHNOLOGY; S36: MATERIALS SCIENCE;
- Descriptors DEI
- BERYLLIUM; GRAIN BOUNDARIES; ITER TOKAMAK; MECHANICAL TESTS; MICROSTRUCTURE; PHYSICAL RADIATION EFFECTS
- Descriptors DEC
- ALKALINE EARTH METALS; CLOSED PLASMA DEVICES; CRYSTAL STRUCTURE; ELEMENTS; MATERIALS TESTING; METALS; RADIATION EFFECTS; TESTING; THERMONUCLEAR DEVICES; THERMONUCLEAR REACTORS; TOKAMAK DEVICES; TOKAMAK TYPE REACTORS
Optional Information
- Contract/Grant/Project number
- Contract W-7405-ENG-36
- Funding organization
- USDOE Assistant Secretary for Defense Programs, Washington, DC (United States).