Published 1989
| Version v1
Miscellaneous
Design features of the fuel channel to be used in the re-tubing of Pickering 3 and 4
Creators
- 1. Atomic Energy of Canada Ltd., Sheridan Park, ON (Canada). CANDU Operations
Description
Increasing deuterium levels in pressure tubes, axial bearing limits and system planning constraints have necessitated the re-tubing of Pickering Units 3 and 4. The fuel channel is the key component to be replaced. Design changes which were introduced were done to primarily improve installability and reduce installation time. In addition however, some design changes were also made to incorporate improved features without jeopardizing the schedule. (author). 2 refs., 8 figs
Additional details
Publishing Information
- ISBN
- 0-919307-39-6; 0-919784-17-8
- Imprint Title
- Proceedings of the 29th annual conference of the Canadian Nuclear Association and 10th annual conference of the Canadian Nuclear Society. V. 1-3
- Imprint Pagination
- 3 v. [1200 p.].
- Journal Page Range
- v. 2 p. 4.19-4.23.
- ISSN
- 0706-1293; 0227-1907
- Report number
- INIS-mf--14668
Conference
- Title
- 10. annual conference of the Canadian Nuclear Society.
- Dates
- 4-7 Jun 1989.
- Place
- Ottawa, ON (Canada).
INIS
- Country of Publication
- Canada
- Country of Input or Organization
- Canada
- INIS RN
- 27015677
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- FUEL CHANNELS; PICKERING-3 REACTOR; PICKERING-4 REACTOR; PRESSURE TUBES; SPECIFICATIONS
- Descriptors DEC
- CANDU TYPE REACTORS; HEAVY WATER COOLED REACTORS; HEAVY WATER MODERATED REACTORS; NATURAL URANIUM REACTORS; PHWR TYPE REACTORS; POWER REACTORS; PRESSURE TUBE REACTORS; REACTOR CHANNELS; REACTOR COMPONENTS; REACTORS; THERMAL REACTORS; TUBES