Published 1989 | Version v1
Miscellaneous

Design features of the fuel channel to be used in the re-tubing of Pickering 3 and 4

  • 1. Atomic Energy of Canada Ltd., Sheridan Park, ON (Canada). CANDU Operations

Description

Increasing deuterium levels in pressure tubes, axial bearing limits and system planning constraints have necessitated the re-tubing of Pickering Units 3 and 4. The fuel channel is the key component to be replaced. Design changes which were introduced were done to primarily improve installability and reduce installation time. In addition however, some design changes were also made to incorporate improved features without jeopardizing the schedule. (author). 2 refs., 8 figs

Part of:
Proceedings of the 29th annual conference of the Canadian Nuclear Association and 10th annual conference of the Canadian Nuclear Society. V. 1-3

Additional details

Publishing Information

ISBN
0-919307-39-6; 0-919784-17-8
Imprint Title
Proceedings of the 29th annual conference of the Canadian Nuclear Association and 10th annual conference of the Canadian Nuclear Society. V. 1-3
Imprint Pagination
3 v. [1200 p.].
Journal Page Range
v. 2 p. 4.19-4.23.
ISSN
0706-1293; 0227-1907
Report number
INIS-mf--14668

Conference

Title
10. annual conference of the Canadian Nuclear Society.
Dates
4-7 Jun 1989.
Place
Ottawa, ON (Canada).

Optional Information