Highlights: • Long term ground temperature response is explored using finite element methods. • Simulation method is validated against experimental and analytical data. • Temperature changes at a fast rate in the first few years and slows down gradually. • ASHRAE recommended separation distances are not always sufficient. • Thermal accumulation occurs at the centre of borehole field. - Abstract: Ground source heat pumps (GSHPs) are an environmentally friendly alternative to conventional heating and cooling systems because of their high efficiency and low greenhouse gas emissions. The ground acts as a heat sink/source for the excess/required heat inside a building for cooling and heating modes, respectively. However, imbalance in heating and cooling needs can change ground temperature over the operating duration. This increase/decrease in ground temperature lowers system efficiency and causes the ground to foul—failing to accept or provide more heat. In order to ensure that GSHPs can operate to their designed conditions, thermal modelling is required to simulate the ground temperature during system operation. In addition, the borehole field layout can have a major impact on ground temperature. In this study, four buildings were studied—a hospital, fast-food restaurant, residence, and school, each with varying borehole configurations. Boreholes were modelled in a soil volume using finite-element methods and heating and cooling fluxes were applied to the borehole walls to simulate the GSHP operation. 20 years of operation were modelled for each building for 2 × 2, 4 × 4, and 2 × 8 borehole configurations. Results indicate that the borehole separation distance of 6 m, recommended by ASHRAE, is not always sufficient to prevent borehole thermal interactions. Benefits of using a 2 × 8 configuration as opposed to a 4 × 4 configuration, which can be observed because of the larger perimeter it provides for heat to dissipate to surrounding soil were quantified. This study indicates that it is important to carefully consider ground temperature during the operation of a GSHP. Borehole separation distances, layout, and hybridization should be studied to alleviate ground fouling problems.
Availability note (English)
Available from http://dx.doi.org/10.1016/j.apenergy.2016.07.048Additional details
Identifiers
- DOI
- 10.1016/j.apenergy.2016.07.048;
- PII
- S0306-2619(16)30989-8;
Publishing Information
- Journal Title
- Applied Energy
- Journal Volume
- 179
- Journal Page Range
- p. 1032-1047
- ISSN
- 0306-2619
- CODEN
- APENDX
INIS
- Country of Publication
- United Kingdom
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 48065948
- Subject category
- S42: ENGINEERING;
- Descriptors DEI
- COOLING SYSTEMS; FINITE ELEMENT METHOD; GREENHOUSE GASES; GROUND SOURCE HEAT PUMPS; OPERATION; SIMULATION
- Descriptors DEC
- CALCULATION METHODS; ENERGY SYSTEMS; HEAT PUMPS; MATHEMATICAL SOLUTIONS; NUMERICAL SOLUTION
Optional Information
- Copyright
- Copyright (c) 2016 Elsevier Science B.V., Amsterdam, The Netherlands, All rights reserved.