Exploitation limits and safety operation limits for initial compact loading of the WWR-K research reactor core
Description
Analysis of initial compact loading of the WWR-K reactor is carried out. It is defined, that reactor reactivity supply should not exceed of 5,24 % (ΔK/K) under calculated efficiencies values of reactor control and protection control systems units in operation cycle start. Value of reactivity supply one should be corrected with taking into account real values of protection control system units efficiencies. Values of normal operation limits are defined by reactor power level in dependence of water expense in first contour and water temperature on entrance of reactor core. Values of reactor operation limits norms are chosen by reactor power (precautionary signalling (PS) setting). The PS setting of reactor core for thermo-hydraulic parameters monitoring is chosen as well
Additional details
Additional titles
- Original title (Russian)
- Ehkspluatatsionnye predely i predely bezopasnostnoj ehkspluatatsii nachal'noj kompactnoj zagruzki aktivnoj zony issledovatel'skogo reactora WWR-K
Publishing Information
- Publisher
- OPNI IYaF RK
- Imprint Place
- Almaty (Kazakhstan)
- ISBN
- 9965-9051-0-X
- Imprint Title
- Renewal of the WWR-K reactor operation: Collection of articles
- Imprint Pagination
- 248 p.
- Journal Page Range
- p. 191-213
INIS
- Country of Publication
- Kazakhstan
- Country of Input or Organization
- Kazakhstan
- INIS RN
- 29067048
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- REACTIVITY COEFFICIENTS; REACTOR CONTROL SYSTEMS; REACTOR CORES; REACTOR FUELING; REACTOR PROTECTION SYSTEMS; START-UP; WATER SUPPLY; WWR-K-ALMATY REACTOR
- Descriptors DEC
- CONTROL SYSTEMS; ENGINEERED SAFETY SYSTEMS; ENRICHED URANIUM REACTORS; REACTOR COMPONENTS; REACTORS; RESEARCH AND TEST REACTORS; RESEARCH REACTORS; TANK TYPE REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; WWR TYPE REACTORS
Optional Information
- Contract/Grant/Project number
- Project K-012; Contract 48-97p
- Notes
- 5 refs., 8 tabs., 11 figs. Imprint:Vozobnovlenie ehkspluatatsii reaktora WWR-K: Sbornik statej