Published 1987 | Version v1
Journal article

Fuel inspection and reconstitution experience at Surry Power Station

  • 1. Virginia Power Co., Richmond, VA (USA)

Description

Surry Power Station, located on the James River near Williamsburg, Virginia, has two Westinghouse pressurized water reactors. Unit 2 consistently sets a high standard of fuel performance (no indication of fuel failures in recent cycles), while unit 1, since cycle 6, has been plagued with numerous fuel failures. Both Surry units operate with Westinghouse standard 15 x 15 fuel. Virginia Power management set goals to reduce the coolant activity, thus reducing person-rem exposure and the associated costs of high coolant activity. To achieve this goal, extensive fuel examination campaigns were undertaken that included high-magnification video inspectionsa, debris cleaning, wet and vacuum fuel sipping, fuel rod ultrasonic testing, and eddy current examination. In the summer of 1985, during cycle 8 operation, Kraftwerk Union reconstituted (repaired) the damage, once-burned assemblies from cycles 6 and 7 by replacing failed fuel rods with solid Zircaloy-4 rods. Currently, cycle 9 has operated for 5 months without any indication of fuel failure (the cycle 9 core has two reconstituted assemblies)

Additional details

Publishing Information

Journal Title
Transactions of the American Nuclear Society
Journal Volume
54
Journal Issue
1
Series
Trans. Am. Nucl. Soc.
Journal Page Range
89
ISSN
0003-018X
CODEN
TANSA

Conference

Title
13. American Nuclear Society international meeting on nuclear power plant operation.
Dates
30 Aug - 3 Sep 1987.
Place
Chicago, IL (USA).

Optional Information

Secondary number(s)
CONF-870837--.