Removal of Shippingport Station primary system components and piping

Description

The primary system components within this workscope consist of the stainless steel reactor coolant piping, check valves, reactor coolant pumps, steam generators, and reactor purification demineralizers and coolers. The four reactor coolant pumps, the four check valves, and several sections of reactor coolant piping were removed and shipped to a laboratory for metallographic examination. This paper describes the work performed, the heavy rigging preparations and procedures, the cutting tools used, component draining/capping techniques to prevent spills, contamination containment, airborne control techniques, and lessons learned during the removal of these primary system components. Summaries of crew size and composition, labor hours, duration hours and radiation exposure to workers are provided and discussed briefly. 6 figs

Availability note (English)

Available from NTIS, PC A03/MF A01; 1 as DE88001859.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
17 p.
Report number
DOE/SSDP--0028

Conference

Title
International decommissioning symposium.
Dates
4-8 Oct 1987.
Place
Pittsburgh, PA (USA).

Optional Information

Notes
Portions of this document are illegible in microfiche products.