Published 1995 | Version v1
Miscellaneous Open

Bruce Unit 2 lay-up engineering assessment

Creators

  • 1. Ontario Hydro, Tiverton, ON (Canada). Bruce Nuclear Generating Station A

Description

The overall lay-up program initiated as a result of the strategic decision to shut down Bruce A unit 2 is briefly described as an introduction to the engineering assessment of the unit 2 systems. The assessment has identified the need to prepare 67 system and 9 equipment lay-up specifications. A summary of the selected system specifications is described. A complete summary and the specifications and the status of unit 2 systems and equipment required to support lay-up and/or the other three operating units is available on request due to the volume of the information. Some logistical details of the lay-up implementation plans, results, and problems to date demonstrate the complexity of the lay-up requirements for a nuclear unit in a multi-unit CANDU station. (author)

Files

29054838.pdf

Files (171.0 kB)

Name Size Download all
md5:4568aff787c54e0845432d6b79f7d6e7
171.0 kB Preview Download
Part of:
Proceedings of the third international conference on CANDU maintenance

Additional details

Publishing Information

Imprint Title
Proceedings of the third international conference on CANDU maintenance
Imprint Pagination
473 p.
Journal Page Range
p. 433-438
Report number
INIS-CA--0018

Conference

Title
3. International conference on CANDU maintenance
Dates
19-21 Nov 1995
Place
Toronto, ON (Canada)

Optional Information

Notes
6 refs.