Bruce Unit 2 lay-up engineering assessment
Description
The overall lay-up program initiated as a result of the strategic decision to shut down Bruce A unit 2 is briefly described as an introduction to the engineering assessment of the unit 2 systems. The assessment has identified the need to prepare 67 system and 9 equipment lay-up specifications. A summary of the selected system specifications is described. A complete summary and the specifications and the status of unit 2 systems and equipment required to support lay-up and/or the other three operating units is available on request due to the volume of the information. Some logistical details of the lay-up implementation plans, results, and problems to date demonstrate the complexity of the lay-up requirements for a nuclear unit in a multi-unit CANDU station. (author)
Files
29054838.pdf
Files
(171.0 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:4568aff787c54e0845432d6b79f7d6e7
|
171.0 kB | Preview Download |
Additional details
Publishing Information
- Imprint Title
- Proceedings of the third international conference on CANDU maintenance
- Imprint Pagination
- 473 p.
- Journal Page Range
- p. 433-438
- Report number
- INIS-CA--0018
Conference
- Title
- 3. International conference on CANDU maintenance
- Dates
- 19-21 Nov 1995
- Place
- Toronto, ON (Canada)
INIS
- Country of Publication
- Canada
- Country of Input or Organization
- Canada
- INIS RN
- 29054838
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- BRUCE-2 REACTOR; OPERATION; REACTOR MAINTENANCE; REACTOR SAFETY; REACTOR SHUTDOWN; REGULATIONS; SAFETY ANALYSIS; SAFETY ENGINEERING
- Descriptors DEC
- CANDU TYPE REACTORS; HEAVY WATER COOLED REACTORS; HEAVY WATER MODERATED REACTORS; LAWS; MAINTENANCE; NATURAL URANIUM REACTORS; PHWR TYPE REACTORS; POWER REACTORS; PRESSURE TUBE REACTORS; REACTORS; SAFETY; SHUTDOWN; THERMAL REACTORS
Optional Information
- Notes
- 6 refs.