Published 1995 | Version v1
Miscellaneous Open

Darlington NGS reactor operation with flux tilt impact on neutron overpower protection

  • 1. Ontario Hydro, Toronto, ON (Canada)

Description

This paper discusses the analysis performed to assess the Neutron Overpower (NOP) system trip coverage for Darlington NGS operation with initial side-to-side and bottom-to-top flux/power tilts. The required trip setpoints of the design basis set of flux shapes were calculated using the Monte Carlo statistical method. Initial flux tilt values of up to 20% were considered in the analyses. The analysis shows that the NOP system with the nominal trip setpoint of 126.0 percent provides adequate protection as long as the NOP detector signals are not re-calibrated after the occurrence of the tilt, or are re-calibrated using the CPPF (channel power peaking factor) corresponding to the tilted flux shape. The analysis also shows that for the case of re-calibrating the detector signals using the CPPF corresponding to the nominal un-tilted flux shape, the NOP system provides the required coverage for tilts of up to 6.8 percent. (author). 9 refs., 2 figs

Files

29000329.pdf

Files (237.9 kB)

Name Size Download all
md5:3e37247e38c6da1d7b9dce12646c19ab
237.9 kB Preview Download
Part of:
Fluorescent X-ray computed tomography using synchrotron radiation for imaging nonradioactive tracer materials

Additional details

Additional titles

Augmented title (English)
Nuclear Generating Station

Publishing Information

Imprint Title
Proceedings of the 19. Canadian Nuclear Society simulation symposium
Imprint Pagination
[350 p.].
Journal Page Range
[9 p.].
Report number
INIS-CA--0010

Conference

Title
19. CNS simulation symposium.
Dates
16-17 Oct 1995.
Place
Hamilton, ON (Canada).

Optional Information