Published August 1991 | Version v1
Report Open

Phase 1 of the Hanford Environmental Dose Reconstruction Project

Description

The work described in this report was prompted by the public's concern about potential effect from the radioactive materials released from the Hanford Site. The Hanford Environmental Dose Reconstruction (HEDR) Project was established to estimate radiation dose the public might have received from the Hanford Site since 1944, when facilities began operating. Phase 1 of the HEDR Project is a ''pilot'' or ''demonstration'' phase. The objectives of this initial phase were to determine whether enough historical information could be found or reconstructed to be used for dose estimation and develop and test conceptual and computational models for calculating credible dose estimates. Preliminary estimates of radiation doses were produced in Phase 1 because they are needed to achieve these objectives. The reader is cautioned that the dose estimates provided in this and other Phase 1 HEDR reports are preliminary. As the HEDR Project continues, the dose estimates will change for at least three reasons: more complete input information for models will be developed; the models themselves will be refined; and the size and shape of the geographic study area will change. This is one of three draft reports that summarize the first phase of the four-phased HEDR Project. This, the Summary Report, is directed to readers who want a general understanding of the Phase 1 work and preliminary dose estimates. The two other reports -- the Air Pathway Report and the Columbia River Pathway Report -- are for readers who understand the radiation dose assessment process and want to see more technical detail. Detailed descriptions of the dose reconstruction process are available in more than 20 supporting reports listed in Appendix A. 32 refs., 46 figs

Availability note (English)

MF available from INIS under the Report Number; OSTI as DE92000552; NTIS; INIS; US Govt. Printing Office Dep.

Files

23016894.pdf

Files (6.8 MB)

Name Size Download all
md5:ca787acc2957632a2409669845a7ceff
6.8 MB Preview Download

Additional details

Additional titles

Subtitle (English)
Summary report: Revision 1

Publishing Information

Imprint Pagination
107 p.
Report number
PNL--7410-HEDR-Rev.1

Optional Information

Contract/Grant/Project number
Contract AC06-76RL01830
Funding organization
USDOE, Washington, DC (United States).