Published June 10, 1997 | Version v1
Report Open

W-087 Acceptance test procedure. Revision 1

Description

This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks

Availability note (English)

Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE99050014; NTIS; US GOVT. PRINTING OFFICE DEP.

Files

30035831.pdf

Files (870.3 kB)

Name Size Download all
md5:fb76cf101429d7dfc2706f448b805c8f
870.3 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
55 p.
Report number
HNF-SD-W087-ATR--001-Rev.1

INIS

Country of Publication
United States
Country of Input or Organization
United States
INIS RN
30035831
Subject category
S46: INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND TECHNOLOGY;
Descriptors DEI
ELECTRICAL EQUIPMENT; ELECTRONIC CIRCUITS; INTERLOCKS; MEASURING INSTRUMENTS; MECHANICAL STRUCTURES; PERFORMANCE TESTING; PUMPS; SWITCHES
Descriptors DEC
ELECTRICAL EQUIPMENT; EQUIPMENT; TESTING