Published June 10, 1997
| Version v1
Report
Open
W-087 Acceptance test procedure. Revision 1
Description
This Acceptance Test Procedure/Operational Test Procedure (ATP/OTP) has been prepared to demonstrate that the Electrical/Instrumentation and Mechanical systems function as required by project criteria and to verify proper operation of the integrated system including the interlocks
Availability note (English)
Available from INIS in electronic form; ALSO AVAILABLE FROM OSTI AS DE99050014; NTIS; US GOVT. PRINTING OFFICE DEP.Files
30035831.pdf
Files
(870.3 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:fb76cf101429d7dfc2706f448b805c8f
|
870.3 kB | Preview Download |
Additional details
Publishing Information
- Imprint Pagination
- 55 p.
- Report number
- HNF-SD-W087-ATR--001-Rev.1
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 30035831
- Subject category
- S46: INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND TECHNOLOGY;
- Descriptors DEI
- ELECTRICAL EQUIPMENT; ELECTRONIC CIRCUITS; INTERLOCKS; MEASURING INSTRUMENTS; MECHANICAL STRUCTURES; PERFORMANCE TESTING; PUMPS; SWITCHES
- Descriptors DEC
- ELECTRICAL EQUIPMENT; EQUIPMENT; TESTING
Optional Information
- Contract/Grant/Project number
- Contract AC06-96RL13200
- Funding organization
- USDOE Office of Environmental Restoration and Waste Management, Washington, DC (United States)