Published 1998 | Version v1
Miscellaneous

Rehabilitation of spillway and intake guides and gates

Description

Operating problems are fairly common at some of the ageing vertical lift intake and spillway gates at many of the older hydroelectric generating stations (GS) in Canada. The problems result from deteriorated or corroded gate guides and roller assemblies. In 1989, the KGS Group reviewed several viable, cost-effective options for rehabilitation. The remedial measures have since been used by several Canadian utilities including Manitoba Hydro, Hydro-Quebec, Ontario Hydro, SaskPower and Winnipeg Hydro. Projects currently underway include: Beauharnois GS intake, Kelsey GS spillway, McArthur GS spillway, Slave Falls GS intake, Island Falls GS intake, Chenaux GS intake, Abitibi Canyon GS intake and Des Joachims GS intake. This paper presents the results of the inspection/assessment of gates and guides and provides details of the overall concepts and rehabilitation methods for the gate and intake guide repairs being implemented at each of these stations. 5 refs., 1 tab., 6 figs

Additional details

Publishing Information

Publisher
Canadian Electricity Association
Imprint Place
Montreal, PQ (Canada)
Imprint Title
Transactions of the CEA electricity '98 conference and exhibition : competition, change, technology : Section 4
Imprint Pagination
[2000 p.]
Journal Page Range
p. 1-19

Conference

Title
Electricity '98 conference and exposition
Dates
27-29 Apr 1998
Place
Toronto (Canada)

INIS

Country of Publication
Canada
Country of Input or Organization
Canada
INIS RN
30009824
Subject category
S13: HYDRO ENERGY;
Resource subtype / Literary indicator
Conference, Non-conventional Literature
Descriptors DEI
ELECTRIC UTILITIES; FATIGUE; HYDROELECTRIC POWER PLANTS; INTAKE STRUCTURES; REPAIR; SPILLWAYS
Descriptors DEC
ELECTRIC POWER INDUSTRY; INDUSTRY; MECHANICAL PROPERTIES; MECHANICAL STRUCTURES; POWER PLANTS; PUBLIC UTILITIES

Optional Information

Notes
Imprint:Printed in 4 volumes.
Secondary number(s)
CONF-980498--