Results of RCM demonstration project at San Onofre Nuclear Generating Station
Description
Southern California Edison Company (SCE) has completed a two year demonstration of Reliability Centered Maintenance (RCM) at San Onofre Nuclear Generating Station (SONGS) Unit 2. SONGS is a 3 unit site. Unit 1 is a 456 MWe pressurized Westinghouse reactor in operation since 1968. Units 2 and 3 are 1127 MWe pressurized Combustion-Engineering reactors in operation since 1984. Unit 2 is a high availability unit with steadily improving plant performance. This paper reports on RCM as an approach to preventive maintenance development and evaluation that consists of a systematic evaluation of system functions and the ways in which functions can fail, leading to the identification of applicable and effective preventive maintenance (PM) tasks with consideration for safety and economics. Considerably more detail on the background of RCM and the details of the RCM methodology is included
Additional details
Publishing Information
- Journal Title
- Proceedings of the American Power Conference
- Journal Volume
- 53
- Series
- Proc. Am. Power Conf.
- Journal Page Range
- 1083-1087
- ISSN
- 0097-2126
- CODEN
- PAPWA
Conference
- Title
- 53. annual American power conference.
- Dates
- 29 Apr - 1 May 1991.
- Place
- Chicago, IL (United States).
INIS
- Country of Publication
- United States
- Country of Input or Organization
- United States
- INIS RN
- 23022886
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- DEMONSTRATION PROGRAMS; ECONOMIC ANALYSIS; PERFORMANCE; REACTOR MAINTENANCE; RELIABILITY; SAFETY; SAN ONOFRE-1 REACTOR; SAN ONOFRE-2 REACTOR; SAN ONOFRE-3 REACTOR
- Descriptors DEC
- ENRICHED URANIUM REACTORS; MAINTENANCE; POWER REACTORS; PWR TYPE REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Secondary number(s)
- CONF-9104106--.