Published March 12, 2009 | Version v1
Journal article

Commissioning the Front End Test Stand High Performance H- Ion Source at RAL

  • 1. STFC, Rutherford Appleton Laboratory, Chilton, Didcot, Oxfordshire OX14 0QX (United Kingdom)
  • 2. Department of Physics, Imperial College, London SW7 2AZ (United Kingdom)

Description

The RAL Front End Test Stand (FETS) is being constructed to demonstrate a chopped H- beam of up to 60 mA at 3 MeV with 50 p.p.s. and sufficiently high beam quality for future high-power proton accelerators (HPPA). High power proton accelerators with beam powers in the several megawatt range have many applications including drivers for spallation neutron sources, neutrino factories, waste transmuters and tritium production facilities. The aim of the FETS project is to demonstrate that chopped low energy beams of high quality can be produced and is intended to allow generic experiments exploring a variety of operational conditions. This paper details the first stage of construction- the installation and commissioning of the ion source. Initial performance figures are reported.

Additional details

Identifiers

Publishing Information

Journal Title
AIP Conference Proceedings
Journal Volume
1097
Journal Issue
1
Journal Page Range
p. 243-252
ISSN
0094-243X
CODEN
APCPCS

Conference

Title
1. international symposium on negative ions, beams and sources
Dates
9-12 Sep 2008
Place
Aix-en-Provence (France)

Optional Information

Notes
(c) 2009 American Institute of Physics