Testing the reactor charging machine

  • 1. Institute for Nuclear Research - Pitesti, PO Box 78, RO-0300 Pitesti (Romania)

Description

One of the main objective of the R - D technological engineering program devoted to the Fuel Handling System is domestic production of equipment and technology for testing the ends of the reactor charging machine (MID) destined to Cernavoda NPP, beginning with Unit 2. To achieve the objective based on an own design, a bench-scale testing stand of MIDs which can simulate the pressure, flow-rate, and temperature conditions proper to fuel channels in operating CANDU 600 reactors. The main components of this testing facility are: - fuel channels, cold also test sections, allowing the coupling of MID end upwardly and downwardly, corresponding to the direction of the water flow through the channel; - technological installation feeding with light water the testing sections of the facility in thermohydraulic conditions, similar to those in the reactor, allowing the cold and hot testings, respectively, of the MID end; - cold testing installation, water supply and oil control panel, feeding the hydraulic drives of the MID's end during the testings; - fixed bridge and mobile carrier for MID's end positioning against testing sections; - installation for functional testing of MID thrusters, before pre-admission and reception tests; - dedicated tools and devices; - raising and transport mechanical devices for handling and positioning the MID's end upon the carrier; - automation panel for controlling the stand equipment and MID's end; - process computer for conducting on-line tests. MID's end testing implies mainly the following operations: - regulation, calibration and functional testing of the MID thrusters carried out independently on a specialised stand; - regulation and calibration of MID's end sub-assemblages; - carrying out the cold and hot pre-admission tests consisting in automatic performing, without operator intervention, of 12 fuel changes, two of which being successive; - performing the cold and hot reception tests, consisting in automatic accomplishment of 4 successive fuel changes, using as algorithm the modified plant code Job R6. The paper contains also an account of the current status of this project as well as a description of the results obtained so far and the last measures of revamping the installation

Availability note (English)

Available from author(s) or Institute for Nuclear Research - Pitesti, PO Box 78, RO-0300 Pitesti (RO). Fax 40-48-262449
Part of:
Nuclear Power - Current Status and Perspectives. INR 1971-2001 Symposium. Volume II

Additional details

Additional titles

Original title (Romanian)
Testarea masini de incarcat - descarcat combustibil

Publishing Information

Publisher
Institute for Nuclear Research - Pitesti
Imprint Place
Pitesti (Romania)
Imprint Title
Nuclear Power - Current Status and Perspectives. INR 1971-2001 Symposium. Volume II
Imprint Pagination
304 p.
Journal Page Range
p. 57-58

Conference

Title
Nuclear Power - Current Status and Perspectives. INR 1971-2001 Symposium
Original Conference Title
Conferinta ENERGETICA NUCLEARA - PREZENT SI VIITOR. ICN 1971-2001. Volum II
Dates
13 Jul 2001
Place
Pitesti (Romania)

Optional Information

Notes
Imprint:Conferinta ENERGETICA NUCLEARA - PREZENT SI VIITOR. ICN 1971-2001. Volum II