Published March 1, 2011 | Version v1
Report

Summary Report for the C50 Cryomodule Project

Description

The Thomas Jefferson National Accelerator Facility has recently completed the C50 cryomodule refurbishment project. The goal of this project was to enable robust 6 GeV, 5 pass operation of the Continuous Electron Beam Accelerator Facility (CEBAF). The scope of the project included removal, refurbishment and reinstallation of ten CEBAF cryomodules at a rate of three per year. The refurbishment process included reprocessing of SRF cavities to eliminate field emission and to increase the nominal gradient from the original 5 MV/m to 12.5 MV/m. New 'dogleg' couplers were installed between the cavity and helium vessel flanges to intercept secondary electrons that produce arcing in the fundamental Power Coupler (FPC). Other changes included new ceramic RF windows for the air to vacuum interface of the FPC and improvements to the mechanical tuner. Damaged or worn components were replaced as well. All ten of the refurbished cryomodules are now installed in CEBAF and are currently operational. This paper will summarize the performance of the cryomodules.

Availability note (English)

Available from https://misportal.jlab.org/ul/publications/downloadFile.cfm?pub_id=9994; PURL: https://www.osti.gov/servlets/purl/1032455/

Additional details

Publishing Information

Imprint Pagination
vp.
Report number
JLAB-ACC--10-1315

Conference

Title
2011 Particle Accelerator Conference (PAC'11)
Dates
28 Mar - 1 Apr 2011
Place
New York, NY (United States)

Optional Information

Contract/Grant/Project number
AC05-06OR23177
Funding organization
USDOE Office of Science (United States)
Secondary number(s)
DOE/OR--23177-1520