Published June 2017
| Version v1
Journal article
Analysis and argumentation about start-up means for periodic test of EDG in NPP
Creators
- 1. Daya Bay Nuclear Power Operations and Management Co. Ltd., Shenzhen (China)
- 2. China Nuclear Power Technology Research Institute, Shenzhen (China)
Description
The related investigations and the latest standard and criterion of start-up means for periodic test of EDG in nuclear power plant (NPP) were analyzed. The necessity for the adoption of slow start-up means during periodic test of EDG in domestic NPP was demonstrated. A modification method was brought forward, its venture was analyzed. This provided an important reference for the related modification in NPP. (authors)
Additional details
Identifiers
Publishing Information
- Journal Title
- Nuclear Safety (Beijing)
- Journal Volume
- 16
- Journal Issue
- 2
- Journal Page Range
- p. 80-84
- ISSN
- 1672-5360
INIS
- Country of Publication
- China
- Country of Input or Organization
- China
- INIS RN
- 51118825
- Subject category
- S22: GENERAL STUDIES OF NUCLEAR REACTORS;
- Descriptors DEI
- ELECTRIC GENERATORS; MODIFICATIONS; NUCLEAR POWER PLANTS; PERFORMANCE TESTING; STANDARDS; START-UP
- Descriptors DEC
- ELECTRICAL EQUIPMENT; EQUIPMENT; NUCLEAR FACILITIES; POWER PLANTS; TESTING; THERMAL POWER PLANTS
Optional Information
- Notes
- 4 figs., 3 tabs., 16 refs.; http://dx.doi.org/10.16432/j.cnki.1672-5360.2017.02.014