Phase timing of the first block of nuclear power plant at Dukovany
Creators
Description
The synchronization is described of two SKODA turbogenerators during the start-up of the first unit of the Dukovany nuclear power plant with WWER-440 type reactor. The procedure is discussed of reactor charging, as is reactor sealing, the complete assembly of the whole system, and mainly the checks of emergency safety equipment. Specific experiments are listed performed after attainment of the 20% power output level. Following the experiments, the power output of the unit was gradually increased to 100% of rated power. (J.C.)
Additional details
Publishing Information
- Journal Title
- Skoda Rev.
- Journal Issue
- no.4
- Series
- Skoda Rev.
- ISSN
- 0374-4523
- CODEN
- SKORA
INIS
- Country of Publication
- Czech Republic
- Country of Input or Organization
- Serbia and Montenegro
- INIS RN
- 18014579
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Descriptors DEI
- DUKOVANY V-2 REACTOR; NUCLEAR POWER PLANTS; PRIMARY COOLANT CIRCUITS; REACTOR FUELING; REACTOR START-UP; SECONDARY COOLANT CIRCUITS; TESTING; TURBOGENERATORS
- Descriptors DEC
- COOLING SYSTEMS; ELECTRIC GENERATORS; ELECTRICAL EQUIPMENT; ENRICHED URANIUM REACTORS; EQUIPMENT; NUCLEAR FACILITIES; POWER PLANTS; POWER REACTORS; PWR TYPE REACTORS; REACTOR COMPONENTS; REACTOR COOLING SYSTEMS; REACTORS; START-UP; THERMAL POWER PLANTS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS; WWER TYPE REACTORS