Published 1992
| Version v1
Book
Total dosimetry for the ten year outages of Units 2-4 and 5 carried out in 1990-1991 at the Bugey Nuclear Generating Centre
Description
The French regulation imposes a very important revision for pressurized water reactors which must be carried out every 10 years. Altogether, all the interventions on the primary and secondary circuits represented 800,000 hours of work for each unit. Total dosimetry varied from 3.45 Sv for Bugey 5 to 6.38 Sv for Bugey 2 - these results were very close to the previsions made according to the activity index of the primary circuit. (author)
Additional details
Additional titles
- Original title (French)
- Bilan dosimetrique des revisions decennales des unites 2-4 et 5 realisees en 1990-1991 au centre de production nucleaire du Bugey
Publishing Information
- Publisher
- International Radiation Protection Association
- Imprint Place
- Montreal, Quebec (Canada)
- ISBN
- 1-55048-657-8
- Imprint Title
- 8. International congress of the International Radiation Protection Association (IRPA8)
- Imprint Pagination
- 2 v.
- Journal Page Range
- (v.2) p. 1497-1499
Conference
- Title
- 8. international congress of the International Radiation Protection Association (IRPA8)
- Dates
- 17-22 May 1992
- Place
- Montreal, Quebec (Canada)
INIS
- Country of Publication
- Canada
- Country of Input or Organization
- Canada
- INIS RN
- 36056717
- Subject category
- S61: RADIATION PROTECTION AND DOSIMETRY;
- Resource subtype / Literary indicator
- Conference
- Descriptors DEI
- COOLANT LOOPS; DOSIMETRY; ELECTRICITE DE FRANCE; PWR TYPE REACTORS; REGULATIONS
- Descriptors DEC
- COOLING SYSTEMS; ENERGY SYSTEMS; ENRICHED URANIUM REACTORS; FRENCH ORGANIZATIONS; LAWS; NATIONAL ORGANIZATIONS; POWER REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- 1 tab.