Published 1992 | Version v1
Book

Total dosimetry for the ten year outages of Units 2-4 and 5 carried out in 1990-1991 at the Bugey Nuclear Generating Centre

Creators

  • 1. Electricite de France, Centre de Production Nucleaire du BUGEY (France)

Description

The French regulation imposes a very important revision for pressurized water reactors which must be carried out every 10 years. Altogether, all the interventions on the primary and secondary circuits represented 800,000 hours of work for each unit. Total dosimetry varied from 3.45 Sv for Bugey 5 to 6.38 Sv for Bugey 2 - these results were very close to the previsions made according to the activity index of the primary circuit. (author)

Part of:
8. International congress of the International Radiation Protection Association (IRPA8)

Additional details

Additional titles

Original title (French)
Bilan dosimetrique des revisions decennales des unites 2-4 et 5 realisees en 1990-1991 au centre de production nucleaire du Bugey

Publishing Information

Publisher
International Radiation Protection Association
Imprint Place
Montreal, Quebec (Canada)
ISBN
1-55048-657-8
Imprint Title
8. International congress of the International Radiation Protection Association (IRPA8)
Imprint Pagination
2 v.
Journal Page Range
(v.2) p. 1497-1499

Conference

Title
8. international congress of the International Radiation Protection Association (IRPA8)
Dates
17-22 May 1992
Place
Montreal, Quebec (Canada)

INIS

Country of Publication
Canada
Country of Input or Organization
Canada
INIS RN
36056717
Subject category
S61: RADIATION PROTECTION AND DOSIMETRY;
Resource subtype / Literary indicator
Conference
Descriptors DEI
COOLANT LOOPS; DOSIMETRY; ELECTRICITE DE FRANCE; PWR TYPE REACTORS; REGULATIONS
Descriptors DEC
COOLING SYSTEMS; ENERGY SYSTEMS; ENRICHED URANIUM REACTORS; FRENCH ORGANIZATIONS; LAWS; NATIONAL ORGANIZATIONS; POWER REACTORS; REACTORS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS

Optional Information

Notes
1 tab.