In 2003 year Mochovce NPP has generated for the first-time in its history more than 6 TWh of electric power. The Mochovce NPP could generate up to 7 TWh yearly, this is the aim of the Mochovce NPP. Without adoption of legislative measures it should be achieved at zero requests on tertiary regulation sidelong of the Slovak Energetic Dispatching and by shortening of time of planned layoff of the blocks (from 47 days to 35 days) at minimisation of unplanned losses in production.