Published July 1994 | Version v1
Journal article Open

BROOKHAVEN: AGS improvements

Creators

Description

The new Booster - AGS Alternating Gradient Synchrotron complex is providing beam while machine development to enhance performance also progresses, so far on schedule. In 1991 the Booster turned on and performed as requested - attesting to a successful construction and quality control programme. In 1992 beam was provided to users while the Booster met most of its operational goals - falling slightly short of its proton intensity goal of 0.5 x 1013 protons per pulse (ppp). This would have been inconsequential except that the Booster intensity seemed to be hitting a fairly solid brick wall of undetermined origin. Since the goal for 1993 called for a doubling of the intensity, the situation seemed serious enough to schedule three months (February - April 1993) for Booster development

Availability note (English)

Also available on-line: http://cds.cern.ch/record/1732310/files/vol34-issue6-p027-e.pdf

Files

47088901.pdf

Files (834.6 kB)

Name Size Download all
md5:e38b730a8b592b2a45d2817d3720af6b
834.6 kB Preview Download

Additional details

Publishing Information

Journal Title
CERN Courier
Journal Volume
34
Journal Issue
6
Journal Page Range
p. 27-29
ISSN
0304-288X
CODEN
CECOA2

INIS

Country of Publication
European Organization for Nuclear Research (CERN)
Country of Input or Organization
International Atomic Energy Agency (IAEA)
INIS RN
47088901
Subject category
S43: PARTICLE ACCELERATORS; S72: PHYSICS OF ELEMENTARY PARTICLES AND FIELDS;
Descriptors DEI
BROOKHAVEN AGS; CONSTRUCTION; PERFORMANCE; PROTONS; QUALITY CONTROL; SCHEDULES
Descriptors DEC
ACCELERATORS; BARYONS; CONTROL; CYCLIC ACCELERATORS; ELEMENTARY PARTICLES; FERMIONS; HADRONS; NUCLEONS; SYNCHROTRONS

Optional Information

Secondary number(s)
INIS-XC--16A0093