BROOKHAVEN: AGS improvements
Creators
Description
The new Booster - AGS Alternating Gradient Synchrotron complex is providing beam while machine development to enhance performance also progresses, so far on schedule. In 1991 the Booster turned on and performed as requested - attesting to a successful construction and quality control programme. In 1992 beam was provided to users while the Booster met most of its operational goals - falling slightly short of its proton intensity goal of 0.5 x 1013 protons per pulse (ppp). This would have been inconsequential except that the Booster intensity seemed to be hitting a fairly solid brick wall of undetermined origin. Since the goal for 1993 called for a doubling of the intensity, the situation seemed serious enough to schedule three months (February - April 1993) for Booster development
Availability note (English)
Also available on-line: http://cds.cern.ch/record/1732310/files/vol34-issue6-p027-e.pdfFiles
47088901.pdf
Files
(834.6 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:e38b730a8b592b2a45d2817d3720af6b
|
834.6 kB | Preview Download |
Additional details
Identifiers
Publishing Information
- Journal Title
- CERN Courier
- Journal Volume
- 34
- Journal Issue
- 6
- Journal Page Range
- p. 27-29
- ISSN
- 0304-288X
- CODEN
- CECOA2
INIS
- Country of Publication
- European Organization for Nuclear Research (CERN)
- Country of Input or Organization
- International Atomic Energy Agency (IAEA)
- INIS RN
- 47088901
- Subject category
- S43: PARTICLE ACCELERATORS; S72: PHYSICS OF ELEMENTARY PARTICLES AND FIELDS;
- Descriptors DEI
- BROOKHAVEN AGS; CONSTRUCTION; PERFORMANCE; PROTONS; QUALITY CONTROL; SCHEDULES
- Descriptors DEC
- ACCELERATORS; BARYONS; CONTROL; CYCLIC ACCELERATORS; ELEMENTARY PARTICLES; FERMIONS; HADRONS; NUCLEONS; SYNCHROTRONS
Optional Information
- Secondary number(s)
- INIS-XC--16A0093