Published August 1995 | Version v1
Report Restricted

Proposed plan for interim remedial measure at the 100-HR-3 Operable Unit

Description

This Proposed Plan identifies the preferred alternative for an interim remedial measure at the 100-HR-3 Operable Unit, located at the Hanford Site. It also summarizes other alternatives evaluated for interim remedial measures in this operable unit. The intent of an interim remedial measure is to speed up actions to address contaminated areas that pose threats to human health or the environment. This Proposed Plan is intended to be a fact sheet for public review that briefly describes the remedial alternatives that have been analyzed, identifies the preferred alternative, and summarizes the information relied upon to recommend the preferred alternative. The preferred alternative presented in this Proposed Plan is to remove contaminated groundwater from the 100-HR-3 Operable Unit, treat it by ion exchange, and dispose of treated groundwater by using upgradient injection wells to return it to the aquifer

Availability note (English)

MF available from INIS under the Report Number; Also available from OSTI as DE95017545; NTIS; US Govt. Printing Office Dep.

Files

Restricted

The record is publicly accessible, but files are restricted to users with access.

Additional details

Publishing Information

Imprint Pagination
15 p.
Report number
DOE/RL--94-102

Optional Information

Contract/Grant/Project number
Contract AC06-93RL12367
Funding organization
USDOE, Washington, DC (United States).