Technical evaluation report on the 120 Vac vital instrument buses and inverter Technical Specifications Issue B71

Description

The operation of a Pressurized Water Reactor (PWR) with one of its 120 Vac vital buses energized in an off-normal mode was analyzed. A Probabilistic Risk Assessment was made to determine the increment of risk by energizing a vital bus from an off-site source directly vs energizing it from its normal, uninterruptible source (i.e., a battery/inverter arrangement). The calculations were made based on uninterruptible source energized vital buses as the normal mode. The analysis indicated that a reduction in the incremental risk increase (caused by plant operation with a vital bus being energized in an off-normal mode) can be accomplished by limiting the time permitted in that condition. Currently, the time that a vital bus can be energized in the off-normal mode is not universally time-limited by plant Technical Specifications. Several alternatives for the reduction in incremental risk were examined and their value/impacts were derived. These data indicate that a recommendation be made for a Technical Specification time limitation of 72 hours per year for off-normal energizing a vital bus during operation of a PWR

Availability note (English)

MF available from INIS under the Report Number; Available from NTIS, PC A02/MF A01 as DE83002498.

Files

14746113.pdf

Files (462.4 kB)

Name Size Download all
md5:7f76dd1e8352c9c8a8964c41bdce8fb3
462.4 kB Preview Download

Additional details

Publishing Information

Imprint Pagination
22 p.
Report number
UCID--19469