Published August 26, 2016
| Version v1
Miscellaneous
Start of on-site preparation work (opening of the pit cover) to examine the drain sump pit of Units 1-2 exhaust stack at Fukushima Daiichi NPS (Reference)
Description
no abstract available
Availability note (English)
Available from Fukushima Nuclear Accident Archive https://f-archive.jaea.go.jp/dspace/handle/faa/161866?locale=engAdditional details
Additional titles
- Augmented title (English)
- Start of on-site preparation work (opening of the pit cover) to examine the drain sump pit of units 1-2 exhaust stack at Fukushima Daiichi NPS on 2016-08-26
Identifiers
Publishing Information
- Imprint Pagination
- 1 p.
INIS
- Country of Publication
- Japan
- Country of Input or Organization
- Japan
- INIS RN
- 52050736
- Subject category
- S21: SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS;
- Resource subtype / Literary indicator
- Non-conventional Literature, No Abstract
- Descriptors DEI
- ACCIDENT MANAGEMENT; CRANES; CUTTING; DRAINAGE; FUKUSHIMA ACCIDENT DATA; FUKUSHIMA DAIICHI NUCLEAR POWER STATION; FUKUSHIMA-1 REACTOR; FUKUSHIMA-2 REACTOR; MELTDOWN; REMOTE CONTROL; ROBOTS; STACKS
- Descriptors DEC
- ACCIDENTS; BEYOND-DESIGN-BASIS ACCIDENTS; BWR TYPE REACTORS; CONTROL; DATASETS; DOCUMENT TYPES; ENRICHED URANIUM REACTORS; EQUIPMENT; FUKUSHIMA ACCIDENT ARCHIVE; MACHINING; MANAGEMENT; MATERIALS HANDLING EQUIPMENT; POWER REACTORS; REACTOR ACCIDENTS; REACTOR SITES; REACTORS; REMOTE HANDLING EQUIPMENT; SEVERE ACCIDENTS; THERMAL REACTORS; WATER COOLED REACTORS; WATER MODERATED REACTORS
Optional Information
- Notes
- Photo files are available from Fukushima Nuclear Accident Archive, Japan; Nuclear Accidents Knowledge Taxonomy (NKMS, IAEA): 5-5-4 Decommissioning planning